Toronto’s expanded basement-flooding subsidy offers up to $6,650 per eligible property for work completed on or after November 12, 2025.
Key information
Toronto’s expanded basement-flooding subsidy offers up to $6,650 per eligible property for work completed on or after November 12, 2025. Check the property’s previous awards and the contractor’s city licence before work.
On this page
Expanded subsidy caps, each up to 80% of eligible invoiced cost
| Work | Maximum | Device limit |
|---|---|---|
| Home plumbing assessment | $500 | One assessment |
| Backwater valves and alarms | $1,600 each | Two devices |
| Sump pump and alarm | $2,250 | One device |
| Sump battery backup | $300 additional | Separate itemized component |
| Foundation-drain severance and capping | $400 | Lifetime category limit |

Key checks at a glance
- Property, contractor and timing requirements
The registered owner of a Toronto single-family home, duplex, triplex or fourplex can apply.
- Inspection and invoice evidence
A backwater valve requires a building permit and inspection.
- Funding, review and equipment limits
The city reviews complete applications and says payment can take up to ten weeks.
Property, contractor and timing requirements
The registered owner of a Toronto single-family home, duplex, triplex or fourplex can apply. The property must not have used its lifetime maximum in each category. Ask BasementFlooding@toronto.ca or 416-338-7668 about prior subsidy history.
Downspouts must be disconnected from the sewer unless the city granted an exemption. Front-yard paving must comply with zoning, and no city debts or taxes may be outstanding when processed. Contractor and subcontractor licences must be valid when they perform the work.
For work on or after November 12, 2025, apply within two years. Earlier work has a one-year deadline and lower historical caps: $1,250 for one valve, $1,750 for one pump and $400 for severance. Do not use the new caps to claim an older installation.
Inspection and invoice evidence
A backwater valve requires a building permit and inspection. Do not cover the valve before inspection; consent to city access and documentation of the installation. A plumber completes the Home Plumbing Assessment Form for that service.
For sump pumps, photograph the pump and the outside discharge pipe. The invoice must separate the pump from any battery backup. Every invoice needs the licensed company name/address, property address, completion date, itemized eligible work and total marked paid in full. Include invoices from subcontractors too.

Funding, review and equipment limits
The city reviews complete applications and says payment can take up to ten weeks. Incomplete submissions are not processed. Funding is first-come, first-served and subject to the annual budget; an application is not a guaranteed payment.
Downspout disconnection itself is not subsidized. An assessment subsidy does not require adopting every plumber recommendation. A backwater valve closes the sewer outlet during overload: do not use plumbing while it is closed because water cannot drain out. Maintain devices under manufacturer instructions.
Questions and answers
What is the expanded property maximum?
Up to $6,650, subject to category caps, 80% cost limits and remaining lifetime eligibility.
Which completion dates use the new caps?
November 12, 2025 or later. Applications under the expansion began May 1, 2026.
Can a fourplex owner apply?
Yes. Single-family, duplex, triplex and fourplex ownership categories are listed.
What is the valve limit?
Up to two devices, each capped at $1,600 and 80% of eligible cost.
Is sump battery backup separate?
Yes. It has an additional $300 cap and must be separately itemized.
Does any plumber qualify?
The contractor and relevant subcontractors need valid City of Toronto business licences at the time of work.
Can I cover the valve before inspection?
No. Obtain the building permit and inspection before covering it.
Is downspout disconnection paid for?
No. It is not eligible work, and disconnection or an exemption is a program condition.
What is the application deadline for new eligible work?
Within two years of installation or service. Earlier work uses the older one-year rule.
Does applying guarantee funding?